GGII and its partner groups have offices and projects worldwide. Take a look at the latest projects GGII and our partners are working on, right now, in Australia, Asia, India and North America.
Project to build 1 x GGII pyrolysis modular Hybrid plant, inclusive of associated buildings and grid connections.
This modular Hybrid plant will produce outputs of both electricity and diesel.
WTE Project Dandenong South
Melbourne, Australia
Bioplant Limited
40 Tons MSW per day.
Bioplant Limited is currently building 1 x GGII pyrolysis modular Hybrid plant, inclusive of associated buildings and grid connections. The pre-treatment equipment is designed sort over 40 tons of MSW per day and the plant will process 21 tons of the dried and sorted MSW per day via a single Hybrid pyrolysis plant.
This is equivalent to supplying power to 1,300 homes and saving 20,000 Tons of GHG emissions, which is equal to taking 4,300 cars of the road.
Project to build 12 x GGII pyrolysis modular Hybrid plants.
Ballarat WTE Project
Victoria, Australia
Bioplant Limited & Andos Technologies Inc
480 Tons of MSW
It is proposed to build 12 x GGII pyrolysis modular Hybrid plants. The pre-treatment equipment is designed sort over 480 tons of MSW per day and 12 Hybrid plants will process 252 tons of the dried and sorted MSW per day via a single Hybrid pyrolysis plant.
This is equivalent to supplying power to 15,600 homes. Local employment of in excess of 70 persons.
Project to build 8 x GGII pyrolysis modular Hybrid plants.
Geelong Energy from Waste Project
Victoria, Australia
Bioplant Limited
320 Tons
Bioplant is currently finalizing contracts to build 8 x GGII pyrolysis modular Hybrid plants. The pre-treatment equipment is designed sort over 320 tons of MSW per day and the plant will process 168 tons of the dried and sorted MSW per day via Eight Hybrid pyrolysis plants.
This is equivalent to supplying power to 10,400 homes. Local employment of in excess of 60 persons.
Project to establish a new waste facility adjacent to the current landfill facility which was established in 2009.
Consolacion Renewable Energy Inc
City of Consolacion, Cebu, Philippines
GGRE & Asain Energyststems Corp
700 Tons MSW
It is planned to reclaim and mine the current landfill cells 1&2 which currently hold in excess of 2 millions tons of MSW.
This is equivalent to supplying power to 1,500 homes. Local employment of in excess of 94 skilled and unskilled persons.
GGRenewable Energy Inc in conjunction with GGIE & Bacavalley Energy Inc are currently building a 21,000 sq meter facility consisting of 5 line GGII Pyrolysis plants (3 x Hybrid plants and 2 x All electricity plants) together with a 400-ton per day anaerobic digester to manage the 600 ton a day waste stream.
Bacavalley Energy Inc
San Pedro, Laguna, Philippines
GG Renerable Energy Inc, BEI Inc
200 Tons MSW
400 tons of Biomass & Food wastes
The pre-treatment equipment is designed sort over 200 tons of MSW and 500 tons of food and biomass wastes per day. The plant will process the feed-stocks via 3 x Hybrid pyrolysis plants and 2 x All Electricity plants and the anaerobic digester will produce enough sufficient methane to drive 4 x 1 MW GE Turbines.
This is equivalent to supplying power to 11,600 homes. Local employment of in excess of 100 persons.
50MW Solar expandable to 80MW in Baarangay Lumbang. Installation of 188,000 solar photovoltaic panels rated at 260wp per panel inclusive of construction of 69kv switchyard.
Lipa City Solar Project
Barangay Lumbang, Lipa City. Batangas, Philippines.
GG Renewable Energy Inc and SBR Clean Energy Corporation
Electricity: 105,000,000kWh/ per year
50MW Solar expandable to 80MW, Installation of 188,000 solar photovoltaic panels rated at 260wp per panel inclusive of construction of 69kv switchyard.
This is equivalent to supplying power to 8,000 homes.
The pre-treatment equipment is designed sort over 40 tons of MSW per day and the pyrolysis plant will process 21 tons of the dried and sorted MSW supplied by the local Government.
Hybrid Plant Mungyeong
Gyeongsangbuk-do, South Korea
GGI Korea
40 tons of wet unsorted MSW per day
The pre-treatment equipment is designed sort over 40 tons of MSW per day and the pyrolysis plant will process 21 tons of the dried and sorted MSW supplied by the local Government.The 21 Ton per day Hybrid pyrolysis plant produces outputs of both Syn-Gas and Diesel.
This is equivalent to supplying 10,000 litres per day of Diesel for home heating and the sewerage pellets are used for replacement fuels.